Pages: 1 2 3 [4]   Go Down
Print
Author Topic: BTR-40 overhaul coming soon... very very soon...  (Read 6493 times)
tascabe
WARPAC Admin
Admin
Knows what he's talking about...
*****
Offline Offline

Posts: 3486


« Reply #45 on: December 27, 2015, 08:15:45 am »

That looks amazing!

After all these years of having that DSHK sitting around - it finally is coming together!
Logged
Mr. Ready
Knows what he's talking about...
*****
Offline Offline

Posts: 521


"As far as I know? Immediately." Gunter Schabowski


« Reply #46 on: December 27, 2015, 06:32:35 pm »

Outstanding!
Logged

"...That might matter if you were a SUPER TACTICAL DOUBLE BURRITO NINJA GUY..." -- Allan Swayze

OP:EW-VI.  {Automatic Rifleman} 12th Albion Lancers.
OP:EW-VII. {Posten Fuhrer} Grenzetruppen.
OP:EW-VIII.{Squad Leader} US Army.
Trucker
East Wind NATO Planning Staff
You might want to listen up...
*****
Offline Offline

Posts: 406



« Reply #47 on: September 11, 2016, 01:29:14 pm »

Last weekend I started the rewire of the BTR. I started out br removing the voltage regulator.

I wanted to use the space to place the new fuse panel.This space is vary convenient. At this location, it will need a cover.
Next was to build a platform for the fuse panel'




Then install it.
« Last Edit: September 11, 2016, 03:19:31 pm by Trucker » Logged
Trucker
East Wind NATO Planning Staff
You might want to listen up...
*****
Offline Offline

Posts: 406



« Reply #48 on: September 11, 2016, 03:33:59 pm »

After the install, took a break, downing a couple of Wild Turkey and sevens. Then ran wire to the master switch, starter button, coil, distributor, and solenoid. Also checked the wire from the battery to the starter. This wire we will leave alone, it is in good shape.





« Last Edit: September 11, 2016, 07:01:08 pm by aswayze » Logged
aswayze
Admin
Knows what he's talking about...
*****
Offline Offline

Posts: 5558


« Reply #49 on: September 12, 2016, 08:11:19 am »

Looking good so far! 

Logged
Pages: 1 2 3 [4]   Go Up
Print
Jump to: